Valeo Battery Cooling Pipe Project
The Valeo Battery Cooling Pipe Project, launched in July 2025, is built around the delivery of an integrated and high-value manufacturing solution. The project establishes a complete value service chain covering the entire process, from early-stage process planning to long-term operation and maintenance support.
Through digitalized process system design and intelligent equipment manufacturing, the project ensures high precision, stable quality, and efficient production for battery cooling pipe manufacturing. Standardized on-site construction methods are applied to improve installation efficiency, ensure consistency, and effectively control project timelines and quality.
In addition, the project incorporates full lifecycle commissioning and management, enabling systematic debugging, performance optimization, and reliable long-term operation. This end-to-end approach provides strong support for the sustainable, efficient, and intelligent operation of the battery cooling pipe production line.
Post time: Feb-13-2026
